Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 11/03/2018 in Posts

  1. UPDATE: Good news and bad. Construction has begun, but the tower will not be functioning until April/ March 2019. 😣 A gate was installed at the south end, up in the hills along the fence line just west of the Memorial Hill. A dozer was also delivered and an access road was made to where the tower will be built. These photos are from the project manager. He apparently likes selfies.
    2 points
  2. We had tire problems just about every trip, since we switch to the 16" wheel and LT tires we usually go 2 seasons minimum with no issues at all. That also includes a trip from So-cal to Moab and up to Manti Utah with no tire issues.
    1 point
  3. For your entertainment :)
    1 point
×
×
  • Create New...